Scheduling jobs, with exponentially distributed processing times, on two machines of a flow shop
In: Naval research logistics: an international journal, Band 20, Heft 1, S. 69-81
Abstract
AbstractThis paper treats the problem of sequencing n jobs on two machines in a "flow shop." (That is, each job in the shop is required to flow through the same sequence of the machines.) The processing time of a given job on a given machine is assumed to be distributed exponentially, with a known mean. The objective is to minimize the expected job completion time. This paper proves an optimal ordering rule, previously conjectured by Talwar [10]. A formula is also derived through Markov Chain analysis, which evaluates the expected job completion time for any given sequence of the jobs. In addition, the performance of a heuristic rule is discussed in the light of the optimal solution.
Problem melden