Aufsatz(elektronisch)8. Januar 2003

Scheduling prowler training

In: Naval research logistics: an international journal, Band 50, Heft 4, S. 289-305

Verfügbarkeit an Ihrem Standort wird überprüft

Abstract

AbstractThe U.S. Navy Prowler aircraft is designed for electronic surveillance and countermeasures. In this paper, we describe the problem of scheduling Prowler crew training, and we present two integer programming models to solve it. The first model maximizes the number of aviators trained above 75% in each mission area, subject to the available number of flights, over a single month. The second model distinguishes peacetime from mobilization, and minimizes the number of flights done in mobilization subject to the available number of flights in peacetime. Our models distinguish different types of crew and allow more than one qualification to be earned on a given flight. We give numerical results using real data, comparing our results to the actual readiness of a squadron. We found that crew readiness of Prowler squadrons can be increased by 10%, simply by better scheduling. © 2003 Wiley Periodicals, Inc. Naval Research Logistics 50: 289–305, 2003.

Sprachen

Englisch

Verlag

Wiley

ISSN: 1520-6750

DOI

10.1002/nav.10063

Problem melden

Wenn Sie Probleme mit dem Zugriff auf einen gefundenen Titel haben, können Sie sich über dieses Formular gern an uns wenden. Schreiben Sie uns hierüber auch gern, wenn Ihnen Fehler in der Titelanzeige aufgefallen sind.